Pinegrove at Heritage Green

  • Client: DR Horton 
  • Contract Value: $21,000,000 
  • Scope of Work included:
    • – Clearing and Grubbing 
    • Erosion and Sediment Control  
    • Earthwork 
    • Storm Drain and SWM 
    • Stream Crossing (Box & Pipe Culverts) 
    • Jack & Bore Utilities 
    • Site Utilities 
    • SWM and Bio Retention 
    • Dry Utilities 
    • Concrete Flatwork 
    • Asphalt Paving  
    • Soil Stabilization 
    • Maryland State Highway

About This Project

DR Horton presented a challenge that to many may have been overwhelming. MCC viewed this challenge just like any other job. Nothing too big or too small for our team. The first 260 acres of a total of 1,200, was to be cleared and mass excavation of 600,000 cubic yards for a grand opening in less than 12 months. MCC spent countless hours engineering and planning alongside DR Horton to produce the best plan possible. We completed a timber harvest operation for the initial 265 acres while the engineering team took on the final designs and permits. In just over eight months, MCC completed the harvest and clearing, mass grading, cast-in place box culverts and headwalls with stream diversions, MDSHA access improvements, 6,000 square yards of asphalt paving, 3,000 linear feet of curb and two miles of sanitary forcemain, storm drain and water.

Gallery

IMG_1672
IMG_1674
IMG_1675
IMG_1676
IMG_1677
IMG_1678
IMG_1683
IMG_1686
IMG_1687
IMG_1692
PlayPause
IMG_1672
IMG_1674
IMG_1675
IMG_1676
IMG_1677
IMG_1678
IMG_1683
IMG_1686
IMG_1687
IMG_1692
previous arrow
next arrow